Remodeling
Kitchen Remodeling
Moving a sink island, adding a dishwasher, or relocating a gas range all come down to plumbing and gas line planning long before cabinets are installed.

We handle the plumbing and gas line scope of kitchen renovations: relocating or adding sink and dishwasher lines, running gas lines for range moves, and coordinating rough-in timing with cabinetry and countertop installation.
In NYC apartments, this often means working within existing wet-wall locations or coordinating with building management for any shared-stack considerations, which we account for early in project planning.
Warning Signs
Signs You Need Kitchen Remodeling
Planning a full kitchen renovation
Moving the sink to an island or new wall
Adding a dishwasher where one didn't exist before
Relocating a gas range or adding a gas line
Upgrading old, corroded supply lines behind kitchen cabinetry
Our Process
How It Works
Layout review
We assess the planned kitchen layout for plumbing and gas feasibility.
Rough-in work
Supply, drain, and gas lines are run or relocated as needed.
Fixture & appliance hookup
Sink, faucet, dishwasher, and gas appliances are connected once cabinetry is set.
Final testing
All connections are pressure and leak tested before completion.
Our Work
Before & After
Photo gallery of specific completed jobs coming soon — here's what the visit typically looks like.
Before: Kitchen Remodeling
After: Kitchen Remodeling
Reviews
What Homeowners Say
“I had a leak in my living room ceiling and couldn't figure out where it was coming from. Keon and his employee showed up quickly after I reached out. They were professional, patient, and took the time to explain everything to me.”
Lisa B.
Brooklyn, NY · Pipe Repair
“Worked on the complicated pipes in our 125-year-old home. We were satisfied with the work and would hire again.”
Makeba D.
Brooklyn, NY · Pipe Repair
“Keon was able to come the same day. He was very meticulous pinpointing the issue and tried to be as minimally invasive as possible.”
Elias Z.
Brooklyn, NY · Pipe Repair
Service Area
Kitchen Remodeling Across New York
Choose your borough for local details and neighborhood coverage.
FAQ
Frequently Asked Questions
Yes, this requires new drain and vent routing, which we plan early in the renovation to avoid conflicts with flooring or cabinetry.
Yes, gas line work for range moves is performed through appropriately licensed partner professionals in accordance with applicable local and state regulations.
Ideally during the design phase, so sink, dishwasher, and gas line locations are confirmed before cabinetry is ordered.
Yes, adding first-time dishwasher plumbing is a common part of kitchen renovation projects.
Yes, we work within the broader renovation timeline set by your general contractor or designer.
From the Blog
More on Kitchen Remodeling
Kitchen Remodeling Plumbing Tips Every Homeowner Should Know
The plumbing decisions in a kitchen remodel need to happen before cabinets are ordered, not after.
Dishwasher Installation: What to Check Before You Buy
The dishwasher that looks perfect online can still be the wrong size for your existing cabinet opening.
When Do You Need a Licensed Master Plumber in NYC?
Some plumbing work requires a licensed master plumber by law. Here's how NYC draws that line.
Need Kitchen Remodeling?
Call now for same-day scheduling across New York City and Long Island.




